| 000 | 02751nam a22004335i 4500 | ||
|---|---|---|---|
| 999 |
_c395047 _d395047 |
||
| 001 | 395047 | ||
| 003 | ES-MaUEC | ||
| 005 | 20230304131508.0 | ||
| 006 | a||||fo|||| 00| 0 | ||
| 007 | cr nn 008mamaa | ||
| 008 | 230304s2022 si | s |||| 0|eng d | ||
| 020 | _a9789811641077 | ||
| 024 | 7 |
_a10.1007/978-981-16-4107-7 _2doi |
|
| 040 |
_aES-MaUEC _bspa _cES-MaUEC _dES-MaUEC |
||
| 050 | 4 |
_aTA820.C6 _b2022 EB |
|
| 100 | 1 |
_aChen, Jian _eautor _4aut _4http://id.loc.gov/vocabulary/relators/aut _9101020 |
|
| 245 | 1 | 0 |
_aShield Tunnel Cutter Replacement Technology _cby Jian Chen, Fanlu Min |
| 250 | _a1st edition 2022 | ||
| 264 | 1 |
_aSingapore _bSpringer International Publishing _c2022 |
|
| 300 |
_a1 recurso en línea (XXIII, 308 páginas) _b247 ilustraciones, 154 ilustraciones a color |
||
| 336 |
_atexto _btxt _2rdacontent |
||
| 337 |
_aelectrónico _bc _2rdamedia |
||
| 338 |
_arecurso electrónico _bcr _2rdacarrier |
||
| 347 |
_aarchivo de texto _bPDF |
||
| 490 | 0 |
_aKey Technologies for Tunnel Construction under Complex Geological and Environmental Conditions _x2662-2912 |
|
| 505 | 0 | _aIntroduction -- Cutting, Wear and Replacement of Cutting Tools During Shield Tunneling -- Conventional Cutterhead & Tool-Changing Under Normal Pressure Technology -- Normal Pressure Tool Change Technology Based on Basic Pressure and Changeable Knife Design -- Stabilization Technology and Tool Change Technology for Open Face with Pressure Open -- Other Special Tool Changing Techniques. | |
| 520 | _aThis book proposes the tool change methods for the excessive tool wear in the construction rules of shield tunnel construction in China. From the perspective of shield tunneling, atmospheric pressure tool change, pressure opening and tool change, and other special techniques, the tool change technologies are proposed. It highlights a number of tool-changing techniques and research and development work, including pressure-changing tools, tool-changing tools in the tool-cylinder arm, and cutter-tooth cutter inter-change since the beginning of the construction of the Nanjing Yangtze River Tunnel. | ||
| 988 | _aSpringer_Engineering_2022 | ||
| 650 | 7 |
_2embne _9406059 _aTúneles _xDiseño y construcción _zChina |
|
| 700 | 1 |
_9683502 _aMin, Fanlu _eautor |
|
| 776 | 0 | 8 |
_iPrinted edition: _z9789811641060 |
| 776 | 0 | 8 |
_iPrinted edition: _z9789811641084 |
| 776 | 0 | 8 |
_iPrinted edition: _z9789811641091 |
| 856 | 4 | 0 |
_uhttps://go.openathens.net/redirector/universidadeuropea.es?url=https://doi.org/10.1007/978-981-16-4107-7 _zAcceso a este recurso digital (usuarios Universidad Europea de Madrid) |
| 942 |
_2lcc _cLE |
||
| 998 |
_b03/2023 _dz _eIG _zSI |
||