| 000 | 02995nam a22004815i 4500 | ||
|---|---|---|---|
| 999 |
_c368562 _d368562 _x1 |
||
| 001 | 368562 | ||
| 003 | ES-MaUEC | ||
| 005 | 20230102121746.0 | ||
| 006 | a||||fo|||| 00| 0 | ||
| 007 | cr nn 008mamaa | ||
| 008 | 220131s2022 si | s |||| 0|eng d | ||
| 020 | _a9789811658969 | ||
| 024 | 7 |
_a10.1007/978-981-16-5896-9 _2doi |
|
| 040 |
_aES-MaUEC _bspa _cES-MaUEC _dES-MaUEC |
||
| 050 | 4 |
_aTA703-705.4 _b2022 EB |
|
| 100 | 1 |
_aChen, Jian _eautor _4aut _4http://id.loc.gov/vocabulary/relators/aut _9101020 |
|
| 245 | 1 | 0 |
_aConstruction Technology of Large Diameter Underwater Shield Tunnel _cby Jian Chen, Fanlu Min, Shouhui Wang |
| 250 | _aFirst edition 2022 | ||
| 264 | 1 |
_aSingapore _bSpringer International Publishing _c2022 |
|
| 300 |
_a1 recurso en línea (XX, 292 páginas) _b191 ilustraciones, 77 ilustraciones a color |
||
| 336 |
_2rdacontent _aTexto _btxt |
||
| 337 |
_2rdamedia _aelectrónico _bc |
||
| 338 |
_2rdacarrier _arecurso electrónico _bcr |
||
| 347 |
_aarchivo de texto _bPDF |
||
| 490 | 0 |
_aKey Technologies for Tunnel Construction under Complex Geological and Environmental Conditions _x2662-2912 |
|
| 505 | 0 | _aIntroduction -- Large Diameter Shield Origination and Arrival Technology -- The Key Technology of Large Diameter Shield Tunneling Shallow Overburden Construction -- The Key Technology of Large-diameter Shield Tunneling through the Embankment -- Technology of slurry Shield Crossing High Infiltration Induced Gravel Composite Stratum in River -- Long-distance Tunneling of Shields and Replacement of Cutting Tools in the River -- Construction Technology of Shield Tunnel Crossing the Middle Channel Section of Yangtze River. | |
| 520 | _aThis book systematically introduces the new technology used in the construction of underwater large slurry shields under complex conditions. The basic principles, scope of application, construction technology and technical points of the key technologies such as the origin and arrival of the shield, crossing the shallow soil in the middle of the river, crossing the guard, and changing the knife and opening the knife are clarified. | ||
| 988 | _aSpringer_Engineering_2022 | ||
| 650 | 7 |
_2embne _9138022 _aIngeniería hidráulica |
|
| 650 | 7 |
_2embne _9138341 _aGeotecnia |
|
| 650 | 7 |
_2embne _9140398 _aTúneles |
|
| 700 | 1 |
_aMin, Fanlu _eautor _4aut _4http://id.loc.gov/vocabulary/relators/aut _9683502 |
|
| 700 | 1 |
_aWang, Shouhui _eautor _4aut _4http://id.loc.gov/vocabulary/relators/aut _9683503 |
|
| 776 | 0 | 8 |
_iPrinted edition: _z9789811658952 |
| 776 | 0 | 8 |
_iPrinted edition: _z9789811658976 |
| 776 | 0 | 8 |
_iPrinted edition: _z9789811658983 |
| 856 | 4 | 0 |
_uhttps://go.openathens.net/redirector/universidadeuropea.es?url=https://doi.org/10.1007/978-981-16-5896-9 _zAcceso a este recurso digital (usuarios Universidad Europea de Madrid) |
| 942 |
_2lcc _cLE _n0 |
||
| 998 |
_b04/2022 _dz _esc _zSI |
||