000 03422nam a22004335i 4500
999 _c120435
_d120435
001 120435
003 ES-MaUEC
005 20230102114041.0
006 a||||fo|||| 00| 0
007 cr nn nnnaamaa
008 200604s2020 gw a o |||| 0|eng d
020 _a9783030465865
024 7 _a10.1007/978-3-030-46586-5
_2doi
040 _aES-MaUEC
_bspa
_cES-MaUEC
_dES-MaUEC
050 4 _aTA169.7
_b2020 EB
100 1 _aBakrī, ʻAdnān
_eautor
_4aut
_4http://id.loc.gov/vocabulary/relators/aut
_1http://viaf.org/viaf/58013016
_9674526
245 1 0 _aSystematic Industrial Maintenance to Boost the Quality Management Programs
_cby Adnan Bakri, Mohd Al-Fatihhi Mohd Szali Januddi
250 _aFirst edition
264 1 _aCham
_bSpringer International Publishing :
_bImprint: Springer
_c2020
300 _a1 recurso en línea (VIII, 78 páginas)
_b43 ilustraciones, 26 ilustraciones a color
336 _2rdacontent
_aTexto
_btxt
337 _2rdamedia
_aelectrónico
_bc
338 _2rdacarrier
_arecurso electrónico
_bcr
347 _aArchivo de texto
_bPDF
490 0 _aSpringerBriefs in Applied Sciences and Technology
_x2191-530X
490 0 _aEngineering (Springer-11647)
505 0 _a1. Introduction -- 2. Quality Control Tools for Systematic Maintenance Management -- 3. Overview of Industrial Maintenance Techniques -- 4. Schedule-based Maintenance.
520 3 _aThis book discusses the main quality management (QM) programs and their possible integration into systematic industrial maintenance (SIM). Unlike traditional engineering maintenance books, it not only explains the theory but also provides practical examples of the integration of QM and SIM programs. It also includes reference sources, making it useful for readers wanting to explore specific areas in more depth. Chapter 1 introduces various aspects of the main quality management (QM) programs, including total quality management (TQM), just-in-time (JIT) and lean manufacturing (Lean). Subsequently, it examines the relation of quality and maintenance. Chapter 2 reviews the concepts of systematic industrial maintenance (SIM) and the application of quality control (QC) tools. Chapter 3 offers an overview, historical perspective and trends in industrial maintenance techniques. Chapters 4, 5, 6, 7, 8 and 9 focus on topics related to schedule-based maintenance, condition-based maintenance, reliability-based maintenance, computerized-based maintenance, risk-based maintenance and total productive maintenance. Covering the theory of each of these types of SIM, the chapters also explain their real-world application in QM and highlight their merits and weaknesses in the context of supporting QM.
988 _aSpringer_Engineering_23062020
650 7 _2embne
_aMantenimiento industrial
_9140848
700 1 _aAl-Fatihhi bin Mohd Szali Januddi, Mohd
_eautor
_4aut
_4http://id.loc.gov/vocabulary/relators/aut
_9674527
710 2 _aSpringerLink (Online service)
_0http://id.loc.gov/authorities/names/no2005046756
_1http://viaf.org/viaf/148105729
776 0 8 _iPrinted edition:
_z9783030465858
776 0 8 _iPrinted edition:
_z9783030465872
776 0 8 _iPrinted edition:
_z9783030465889
856 4 0 _uhttps://go.openathens.net/redirector/universidadeuropea.es?url=https://doi.org/10.1007/978-3-030-46586-5
_zAcceso a este recurso digital (usuarios Universidad Europea de Madrid)
942 _2lcc
_cLE
998 _b06/2020
_dz
_eIG
_zSI