| 000 | 04358nam a22004335i 4500 | ||
|---|---|---|---|
| 710 | 2 |
_aSpringerLink (Online service) _9106996 |
|
| 999 |
_c110740 _d110740 _x1 |
||
| 001 | 110740 | ||
| 003 | ES-MaUEC | ||
| 005 | 20230102113435.0 | ||
| 006 | a||||fo|||| 00| 0 | ||
| 007 | cr nn nnnaamaa | ||
| 008 | 181001s2019 gw a o |||| 0|eng d | ||
| 020 | _a9783030011833 | ||
| 024 | 7 |
_a10.1007/978-3-030-01183-3 _2doi |
|
| 040 |
_bspa _dES-MaUEC _cES-MaUEC |
||
| 050 | 4 |
_aTS157.5 _b2019 EB |
|
| 100 | 1 |
_aKopanos, Georgios M. _eautor _9670467 |
|
| 245 | 1 | 0 |
_aSolving Large-Scale Production Pcheduling and Planning in the Process Industries _cGeorgios M. Kopanos, Luis Puigjaner |
| 264 | 1 |
_aCham _bSpringer International Publishing : _bImprint: Springer _c2019 |
|
| 300 |
_a1 recurso en línea (XXIV, 291 páginas) _b109 ilustraciones, 78 ilustraciones a color |
||
| 336 |
_2rdacontent _aTexto _btxt |
||
| 337 |
_2rdamedia _aelectrónico _bc |
||
| 338 |
_2rdacarrier _arecurso electrónico _bcr |
||
| 347 |
_atext file _bPDF |
||
| 490 | 0 | _aEngineering (Springer-11647) | |
| 505 | 0 | _aPart I: Overview -- Introduction -- State of the Art -- Methods and Tools -- Part II: Continuous Processes -- Production Planning and Scheduling of Parallel Continuous Processes -- Part III: Semicontinuous Processes -- Production Scheduling in Multistage Semicontinuous Process Industries -- Resource-Constrained Production Planning and Scheduling in Semicontinuous Process Industries -- Simultaneous Optimization of Production & Logistics Operations in Semicontinuous Process Industries -- Part IV: Batch Processes -- Production Scheduling in Large-Scale Multistage Batch Process Industries. Part V: Integrated-System Approach -- Integrated Operational and Maintenance Planning of Production and Utility Systems -- Part VI: Conclusions and Outlook -- Appendixes. | |
| 520 | 3 | _aThis book presents a number of efficient techniques for solving large-scale production scheduling and planning problems in process industries. The main content is supplemented by a wealth of illustrations, while case studies on large-scale industrial applications, ranging from continuous to semicontinuous and batch processes, round out the coverage. The book examines a variety of complex, real-world problems, and demonstrates solutions that are applicable to scenarios and countries around the world. Specifically, these case studies include: • the production planning of the bottling stage of a major brewery at the Cervecería Cuauhtémoc Moctezuma (Heineken Int) in Mexico; • the production scheduling for multi-stage semicontinuous processes at an ice-cream production facility of Unilever in the Netherlands; • the resource-constrained production planning for the yogurt production line at the KRI KRI dairy production facility in Greece; and • the production scheduling for large-scale, multi-stage batch processes at a pharmaceutical batch plant in Germany. In addition, the book includes industrial-inspired case studies of: • the simultaneous planning of production and logistics operations considering multi-site facilities for semicontinuous processes; and • the integrated planning of production and utility systems in process industries under uncertainty. Solving Large-scale Production Scheduling and Planning in the Process Industries offers a valuable reference guide for researchers and decision-makers alike, as it shows readers how to evaluate and improve existing installations, and how to design new ones. It is also well suited as a textbook for advanced courses on production scheduling and planning in industry, as it addresses the optimization of production and logistics operations in real-world process industries. | |
| 650 | 7 |
_2embne _aProducción _xPlanificación _9139176 |
|
| 650 | 7 |
_2embne _aProducción _xControl _9228489 |
|
| 650 | 7 |
_2embne _aGestión de la producción _9150644 |
|
| 700 | 1 |
_aPuigjaner, Luis _eautor _923773 |
|
| 776 | 0 | 8 |
_iPrinted edition: _z9783030011826 |
| 776 | 0 | 8 |
_iPrinted edition: _z9783030011840 |
| 776 | 0 | 8 |
_iPrinted edition: _z9783030131647 |
| 856 | 4 | 0 |
_uhttps://go.openathens.net/redirector/universidadeuropea.es?url=https://doi.org/10.1007/978-3-030-01183-3 _zAcceso a este recurso digital (usuarios Universidad Europea de Madrid) |
| 942 |
_2lcc _cLE |
||
| 988 | _aPrimersemestre_2019_Engineering | ||
| 998 |
_aSI _cm _dz _feng _ggw _h0 _b09/2019 _eel _zSI |
||